Joined
·
7,652 Posts
13 turkeys and a firstborn son.Price?
Sent from my SM-G996U using Tapatalk
13 turkeys and a firstborn son.Price?
Sent from my SM-G996U using Tapatalk
Order doors now, I've been seeing lots of people say they're running 26-32 week lead times.LOL close
$18,800 without doors
That is great I have been sitting on my order for my Truss for a few months I am going to need to pull the trigger on that before Saturday. That will save me around $800Menards 11% sale.... go go go. First time 12/2 NMB is at double price in almost two years.
Why did you need the measurements for the beam?
Nice work on the trim! Everything is coming along nicely it seems!
Right on!When, I installed the beam I measured up From the floor an equal distance only to find later that the floor was way off. So when, I built the cabinets I had to shim the shit out of them to get my granite, level now that my granite is level, I want the trim around the beam level also it was only off 1 and 3/8 inch over a 13'-6" span. I don't know if anyone would ever see it but I would know and it would drive me nuts knowing I could have set it level. This will allow for tighter joints in the corners of the trim when everything is connecting at a true 90.
RBB