Great Lakes 4x4. The largest offroad forum in the Midwest banner

1 - 5 of 5 Posts

·
Registered
Joined
·
266 Posts
Discussion Starter #1
I have a 60° cv drive shaft from driveshaft super store in usable condition that fits a np205 front output flange. It was still working OK when I took the truck apart it's been welded on to keep it together all the u-joint caps have been tacked in its NOT PERFECT OR BRAND NEW but works $175




Triple stick shifters from ORD all parts are with it for 203/205 doubler other than shift rails $75obo



No trades
 

·
Registered
Joined
·
914 Posts
I have a 60° cv drive shaft from driveshaft super store in usable condition that fits a np205 front output flange. It was still working OK when I took the truck apart it's been welded on to keep it together all the u-joint caps have been tacked in its NOT PERFECT OR BRAND NEW but works $175




Triple stick shifters from ORD all parts are with it for 203/205 doubler other than shift rails $75obo



No trades
what is the front splines ?
 
1 - 5 of 5 Posts
Top