Go Back   Great Lakes 4x4. The largest offroad forum in the Midwest > 4x4 Talk > Rig Builds and Pics
GL4x4 Live! GL4x4 Casino

Rig Builds and Pics Introduce your rig or post a buildup here.







Search
Reply
 
Thread Tools
Old August 22nd, 2009, 01:40 PM   #21
blackjeep
| 11I1I11 |
 
blackjeep's Avatar
 
Join Date: 12-24-08
Location: Rochester Hills
Posts: 325
iTrader: (8)
Quote:
Originally Posted by Mr. Beefy View Post
What are you doing with all them switches and routers???
That's my CCNA/future CCNP lab, and possibly one or two devices could eventually help with a CCIE. Some of this stuff obviously is a few years old (the 2600's were mf'd in 2004), but for my CCNA purposes, it'll be overkill to have all 6 appliances. I have a few more WIC 2t and 1t cards on the way, and an interface for my old frame relay router to use an octal cable for everything, so I can cut back on the serial cables and use the RJ45 instead. It's a nice modern touch for these "ancient" boxes.

There's actually also one of these in the mail right now


My current 12U rack for the servers/networking equipment has met it's limit, and then exceeded it. It's time to upgrade to 42U and relocate to the back half of the basement. The current rack, as it sits, is overloaded with equipment to the tune of a 1U Xserve, a 4U custom FTP/other services machine, a 1U firewall, 2U UPS, 1U breaker, 1U KVM, and a 2U Intel quad core xeon storage machine. Plus there's switches in the back. The heat output is astounding.

Last edited by blackjeep; August 22nd, 2009 at 02:11 PM.
blackjeep is offline   Reply With Quote
Old September 1st, 2009, 10:29 AM   #22
Mr. Beefy
Randy did it.
 
Mr. Beefy's Avatar
 
Join Date: 01-11-07
Location: Sault Ste. Marie
Posts: 10,042
iTrader: (19)
.
.
.
.
.
.
.<----------Jealous
Mr. Beefy is offline   Reply With Quote
Old September 1st, 2009, 10:35 AM   #23
Mclovin
"The Situation"
 
Mclovin's Avatar
 
Join Date: 11-07-05
Location: Dearborn Heights, Mi
Posts: 14,390
iTrader: (15)
Send a message via AIM to Mclovin Send a message via Yahoo to Mclovin
Quote:
Originally Posted by blackjeep View Post
That's my CCNA/future CCNP lab, and possibly one or two devices could eventually help with a CCIE. Some of this stuff obviously is a few years old (the 2600's were mf'd in 2004), but for my CCNA purposes, it'll be overkill to have all 6 appliances. I have a few more WIC 2t and 1t cards on the way, and an interface for my old frame relay router to use an octal cable for everything, so I can cut back on the serial cables and use the RJ45 instead. It's a nice modern touch for these "ancient" boxes.

There's actually also one of these in the mail right now


My current 12U rack for the servers/networking equipment has met it's limit, and then exceeded it. It's time to upgrade to 42U and relocate to the back half of the basement. The current rack, as it sits, is overloaded with equipment to the tune of a 1U Xserve, a 4U custom FTP/other services machine, a 1U firewall, 2U UPS, 1U breaker, 1U KVM, and a 2U Intel quad core xeon storage machine. Plus there's switches in the back. The heat output is astounding.
Mclovin is offline   Reply With Quote
Old September 1st, 2009, 10:44 AM   #24
xj97sport
atv rider
 
xj97sport's Avatar
 
Join Date: 01-08-08
Location: south west
Posts: 6,557
iTrader: (20)
Quote:
Originally Posted by Mclovin View Post
x2
xj97sport is offline   Reply With Quote
Reply
Great Lakes 4x4. The largest offroad forum in the Midwest > 4x4 Talk > Rig Builds and Pics
Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump



All times are GMT -5. The time now is 06:37 PM.


Powered by: vBulletin, Copyright 2000 - 2012, Jelsoft Enterprises Ltd.
Copyright 2005 - 2012 Cracker Enterprises - Powered by Linux
vB Ad Management by =RedTyger=
Page generated in 0.08048 seconds with 18 queries