crassell
Senior Member
 
crassell's Avatar
 
Join Date: 08-03-06
Location: Davisburg MI
Posts: 1,346
iTrader: (43)
Mentioned: 0 Post(s)
Default Garage building in OC

Who here has erected a polebarn/garage on their property? Did you do all this to obtain a building permit?
http://www.springfield-twp.us/bld_permreq.htm
crassell is offline   Reply With Quote
Sponsored Links
Advertisement
 
Old January 16th, 2011, 09:52 AM   #2
pjkravetz
Jeep in pieces
 
pjkravetz's Avatar
 
Join Date: 07-18-08
Location: Davisburg, MI
Posts: 420
iTrader: (1)
Mentioned: 2 Post(s)
Default

When I did the addition to the front of my garage, I did submit 3 copies of plans that were hand drawn showing what they reqested (foundation, cross-section, materials, elevation, etc.). For the plot plan I just photo-copied my mortgage plot plan and hand drew in the addition; no drainage or grades shown. No septic, well, driveway, permits were required.
pjkravetz is offline   Reply With Quote
Old January 16th, 2011, 10:23 AM   #3
crassell
Senior Member
 
crassell's Avatar
 
Join Date: 08-03-06
Location: Davisburg MI
Posts: 1,346
iTrader: (43)
Mentioned: 0 Post(s)
Default

ok, that answers some questions. In addition to the above i have to submit letters from my bordering neighbors of their acceptance to a garage in my backyard.
crassell is offline   Reply With Quote
Old January 16th, 2011, 10:35 AM   #4
whiterhino
I'm not old, honest...
 
whiterhino's Avatar
 
Join Date: 03-07-06
Location: Davisburg MI
Posts: 22,329
iTrader: (22)
Mentioned: 27 Post(s)
Default

I tore down my old garage prior to building the new one. So, I had a demo permit that gave me "pre existing, non conforming" being too close to my property line. With that, the neighbors had no input. I wouldn't think you need neighbor's input unless you are requesting a variance. Yes, all the drawings and permits are required.
whiterhino is offline   Reply With Quote
Old January 16th, 2011, 11:51 AM   #5
mtnbikinbryno
Senior Member
 
mtnbikinbryno's Avatar
 
Join Date: 11-08-05
Location: TC
Posts: 5,403
iTrader: (3)
Mentioned: 1 Post(s)
Send a message via AIM to mtnbikinbryno
Default

That's really not a whole lot of stuff. Pretty standard building/zoning requirements.
mtnbikinbryno is offline   Reply With Quote
Old January 16th, 2011, 01:07 PM   #6
Haggar
Covered in mud...
 
Haggar's Avatar
 
Join Date: 11-06-05
Location: Oxford, MI
Posts: 17,793
iTrader: (58)
Mentioned: 4 Post(s)
Default

Yeah, seems standard.

Typically, you'd only need to have neighbors approval when you are non-conforming, or due to association rules.

Note that some of those things are not required if they aren't applicable to your build. For example, if you aren't near your septic and aren't messing with it, then you don't likely need to show them a sepric permit, unless you are running a waste line from the barn and have to prove elevations.
Haggar is offline   Reply With Quote
Old January 16th, 2011, 02:24 PM   #7
Bigfoot
Newbie
 
Join Date: 01-11-11
Location: Decatur, Mi
Posts: 2
iTrader: (0)
Mentioned: 0 Post(s)
Default

I had a pole barn put up 2 months ago. Contractor takes care of all that. township inspector came out and made sure I was at least 20' from property lines and more than 50' from road. Contractor came out and drew up basic map of location, ordered kit from lumber company, and contacted a team to put it up. State inspector came out once the post holes were dug and gave approval to insert posts and start building. once the building was done, I called the inspector out for a final. I learned one thing: do not start to insulate or put in electric until after you get final inspection! Then you can do what you want with the building.
Bigfoot is offline   Reply With Quote
Reply
Great Lakes 4x4. The largest offroad forum in the Midwest > General 4x4 Stuff > The Pub

Thread Tools Search this Thread
Search this Thread:

Advanced Search

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 07:55 PM.


Powered by: vBulletin, Copyright 2000 - 2012, Jelsoft Enterprises Ltd.
User Alert System provided by Advanced User Tagging (Lite) - vBulletin Mods & Addons Copyright © 2014 DragonByte Technologies Ltd. Runs best on HiVelocity Hosting.
Page generated in 0.15324 seconds with 42 queries