Thread: Driveway tech
View Single Post
Old May 8th, 2013, 10:28 PM   #13
muddinman56
blood,sweat and beers
 
muddinman56's Avatar
 
Join Date: 10-06-08
Location: armada michigan
Posts: 3,521
iTrader: (18)
Get 2-3 inch crushed concret have it rolled then get 2-4 inches of 21 AA lime stone then be done with it for a while that's what we have done in some people's driveways
muddinman56 is offline   Reply With Quote
 
Page generated in 0.02816 seconds with 11 queries