View Single Post
Old July 24th, 2010, 08:46 AM   #56
Jdc215
Senior Member
 
Jdc215's Avatar
 
Join Date: 02-18-08
Location: Hartland/Fenton
Posts: 1,071
iTrader: (6)
Mentioned: 0 Post(s)
Default

the rear drive shaft i ordered showed up today but its about an inch and a half too long. its a great looking drive line but its just too long. i also ordered my axle rebuild kit and a Old Man Emu steering stabilizer. i should be able to get the front locker and chromolly shafts installed by next weekend, ill have the rebuild kit on or before Thursday so ill prolly try to tear it apart then. try to get the locker installed on friday or saturday and have it all back together by the end of the weekend. ill have to do a little work to get the steering stabilizer installed and i should have that drive shaft back some time late next week. should be all ready for the 7th. im planning on going up to the mounds that day since its been a while. seems like the weekends get booked so damn fast.
Attached Thumbnails
Click image for larger version

Name:	New drive shaft and old drive shaft.jpg
Views:	123
Size:	91.1 KB
ID:	65630  

Last edited by Jdc215; July 25th, 2010 at 09:32 AM.
Jdc215 is offline   Reply With Quote
 
Page generated in 0.04005 seconds with 12 queries